
Condo and unit renovations in Scarborough
Scarborough condo and rental unit renovations covering the kitchen, bathroom, flooring, paint and trim, with a written job list for each unit.
One scope for the rooms in the unit
MRG Renovations Ltd. is a general contractor for whole-unit renovations in condos, rental buildings and retirement residences.
The work can include removal of old finishes, flooring, kitchen cabinets and counters, bathroom fixtures, wall repairs, paint and trim.
Tell us whether the unit is empty and which rooms need to be usable while the work is underway.
For a manager arranging several units, identify each unit separately so one bathroom replacement does not get confused with a flooring-only job next door.
Each unit has its own written job list, and extra work is agreed before it starts.
The first walk through the unit
List what stays room by room, including cabinets, appliances, flooring and doors that are still in suitable condition.
A new floor changes the height at thresholds, and fresh trim meets walls that may need patching after the old pieces come off.
Photos should show the whole room and any damage around the kitchen sink, toilet or tub.
Include rough floor area and the number of bathrooms, along with the parts you have already ordered.
The order of work has to connect those rooms, since a finished hallway still needs to carry the remaining kitchen materials.
Deliveries and work in an occupied building
Send management's renovation package and the instructions for the service entrance, elevator and loading area before a work date is agreed.
A delivery booking has to account for the walk to the unit as well as the lift itself, including stairs or a garage height restriction.
Ask where materials and removed finishes can wait without blocking a common corridor or an exit.
MRG agrees work hours, elevator use, noise and corridor protection with the building before starting unit work.
Debris is removed as work proceeds and the corridor is left clean at the end of the day.

Housing types in Scarborough
The City's 2021 Scarborough profile counts 76,975 homes in buildings of five or more storeys, representing 35.2 per cent of occupied homes.
West Hill alone has 3,500 homes in that building category in the neighbourhood data, alongside detached homes and row houses.
These figures describe the housing mix and do not tell us which buildings are condominiums or what their renovation rules require.
For your unit, ask management about underlay approval, plumbing shutoffs and any drawings needed for the proposed changes.
Rules and policies differ between corporations, and a rental apartment manager has instructions specific to that building too.
Source: City of Toronto, 2021 Scarborough Community Council Area profile
Agree the finish list before turnover
Write down the rooms being painted and identify the ceilings, doors and trim that need paint along with any damaged areas requiring repair.
For the kitchen, specify whether the cabinets stay and only the counter changes, or whether the whole set is being replaced.
Send the next occupant's planned arrival with the room list and material delivery dates.
MRG supplies finished-unit photos at handover alongside the itemised scope and the written notes for agreed changes.
Start with the unit size, the room list and the building instructions so the written quote addresses the actual turnover.
Related work and Scarborough access
Sources for this page
- City of Toronto, 2021 Scarborough Community Council Area profile
- City of Toronto, 2021 neighbourhood profiles
- Condominium Authority of Ontario, governing documents
Sources checked on 15 November 2026.
Questions about condo and unit renovations
Which rooms belong in a condo renovation agreement?
MRG Renovations Ltd. is a general contractor for whole-unit renovations in condos, rental buildings and retirement residences.
The work can include removal of old finishes, flooring, kitchen cabinets and counters, bathroom fixtures, wall repairs, paint and trim.
Tell us whether the unit is empty and which rooms need to be usable while the work is underway.
What is checked during the first walk through a unit?
List what stays room by room, including cabinets, appliances, flooring and doors that are still in suitable condition.
A new floor changes the height at thresholds, and fresh trim meets walls that may need patching after the old pieces come off.
Photos should show the whole room and any damage around the kitchen sink, toilet or tub.
How do deliveries work around an occupied building?
Send management's renovation package and the instructions for the service entrance, elevator and loading area before a work date is agreed.
A delivery booking has to account for the walk to the unit as well as the lift itself, including stairs or a garage height restriction.
Ask where materials and removed finishes can wait without blocking a common corridor or an exit.
Tell us about the rooms
Send the rooms, rough sizes and what you want replaced, along with any building instructions.